View all projects »

What they’re saying

This project went very smoothly. We designed 57 miles of pipelines with 17 stations in a year's time, which was a big undertaking. The way this project was handled was very efficient and professional. Our companies worked very well together.

- David J. Klimas - P.E., EN Engineering

Wisconsin Public Service: Guardian Gas Pipeline Mapping

In 2007, Wisconsin Public Service needed to map a 57 mile corridor in northeast Wisconsin in which a gas pipeline and associated laterals were to be installed. This project needed to be completed on a tight time frame and during late fall, a period with less than optimal lighting conditions for aerial imagery acquisition.

AeroMetric utilized its Z/I Imaging Digital Mapping Camera (DMC) to acquire high resolution digital imagery with excellent contrast even during this low sun angle period. Our Optech Gemini Light Detection and Ranging (lidar) sensor was used during after sundown to provide a dense elevation point cloud to support a one foot contour terrain surface representation. The combination of these two technologies allowed the imagery to be acquired in the short time frame required.

Using the combination of DMC and Lidar imagery, AeroMetric delivered digital terrain models, 1-foot contour-topographic maps, and high resolution 6" pixel digital orthophotos. The digital survey data was used by EN Engineering of Woodridge, IL, to design the installation of the mainline and underground lateral conduit system.

Stay Informed
Contact

Please fill out the information below and we will contact you shortly.

Close this box

Subscribe

Enter the information below to stay up-to-date on all the latest AeroMetric news & events.

Close this box